On the 9 February 2003 the new SA-24 was lifted onto a low-loader ready for transportation to Swansea for launching.
On the 10 February 2003 the new SA-24 was launched at Swansea.
Alongside at Swansea awaiting engine testing and sea trials
On the 9 February 2003 the new SA-24 was lifted onto a low-loader ready for transportation to Swansea for launching.
On the 10 February 2003 the new SA-24 was launched at Swansea.
Alongside at Swansea awaiting engine testing and sea trials
© COPYRIGHT 2006- - Marine Rescue Shoalhaven – Website Design by: Scott Morgan - Multimedia Design